zdow

A lot is of things happening on the islands :)

A quick report from Grzegorza Sępołowicz: Currently there are more than 30 common terns Sterna hirundo courting in the reservoirs. Black tern Chlidonias nigra, Eurasian oystercatcher Haematopus ostralegus, common shelduck Tadorna tadorna, little ringed plover Charadrius dubius, black-headed gull Chroicocephalus ridibundus and greylag goose Anser anser with its 2 – 3 day old hatchlings have

Record-breaking amount of common tern

Today, in the reservoir in Kaleńkso, we discovered a record-breaking amount of common tern Sterna hirundo. In the photograph below 146 birds can be distinguished, and these are not all of the specimen that were captured in the frame. We can speculate that at the moment when the photograph was taken there were around 200

News from the platforms

There is a lot of courting happening on the platforms in Kaleńsko. Grzegorz Sępołowicz, the leader of the monitoring team, has been observing courting little ringed plovers Charadrius dubius for a few days now. Terns also appeared… One of the photographs present the mating dance of common tern Sterna hirundo.

The third island awaits the birds

We are glad to inform that we have finished the installation of the third floating island. It can be seen on the reservoir in Kaleńsko. We hope that this installment will help increase breeding successfulness even further. As you can see in one of the photographs, the last island was equipped with an innovative feature

Our t-shirts gain popularity :)

We have stumbled upon the news that in a recent episode of the show called “Detektywi w akcji” a shirt of ours can be seen in a shot – what a nice accent 🙂

Żabczyn – the works gain momentum

The work on building the reservoir gains momentum. The valve in the canal has been already replaced – this will allow us to control the water level so it does not flood the area around it. With the valve closed and the water level lowered we will be able to mow the grass. Last week,

Not just floating islands

Apart from constructing the floating islands, we are also raising the importance of the reservoir by the ground works aimed at creating a convenient natural environment with suitable conditions. We are converting a spit into an island, additionally reinforcing its shoreline. We are also “rising” already existing islands so they appear quicker when the water

We are starting the next phase of our project

Żabczyn is the new ground for our work. There is no reservoir yet, but we started working on creating one next to Ujście Warty National Park’s body of water, where we will be able to control the water level. We are going to accomplish it by renovating and changing the function of the valve on

Our hatchlings are growing up

The photographs and movies were taken during the environmental monitoring as a part of realization of the project “Preservation of the biodiversity in the following areas: Natura 2000 “Dolna Odra” (PLB320003 and PLH320037) and “Ujście Warty” (PLC080001)” through creation of nesting sites for birds and protection of those nesting sites against invasive species” led by